Corrective Work to Improve Dipole Testing Sensitivity Can Damage Geosynthetics
Proper electrical isolation can make a significant difference in the quality and reliability of a dipole leak detection survey. Poor site isolation reduces the sensitivity of the test and can prevent the detection of leaks, including relatively large defects.
In some cases, dipole testing is requested only after construction has been completed, when no electrical isolation has been incorporated into the site. Establishing isolation at this stage may require excavating a perimeter trench, which poses a significant risk of damaging the geomembrane. This risk can be reduced by using a vacuum truck or similar non-destructive excavation equipment.
When conventional excavators are used instead, the geomembrane can easily be torn, even under continuous supervision. The corrective work intended to improve testing sensitivity may therefore create more leaks than those found throughout the rest of the installation.